Generator Sizing Guide Africa

Generator Sizing Guide Africa

Learn how to estimate generator capacity using load demand, starting current, phase, duty and runtime.

How to Size a Generator Correctly

Correct generator sizing is one of the most important steps when planning a backup or independent power system.

A generator that is too small may struggle with starting loads, voltage stability and overheating. A generator that is unnecessarily large can increase purchase cost, fuel consumption and maintenance requirements.

Start by reviewing the equipment that must operate during an outage or at the project site.

Step 1: Prepare a Load List

List every appliance, machine or system that will run from the generator.

  • Lighting
  • Refrigeration
  • Air conditioning
  • Pumps
  • Compressors
  • Computers and office equipment
  • Workshop machinery
  • Medical equipment
  • Industrial motors

Step 2: Calculate Running Load

Add the normal running demand of the equipment expected to operate at the same time.

The final generator should not be selected only from the total nameplate watts because motor starting loads can temporarily require much more power.

Step 3: Identify Starting Loads

Pumps, compressors, air conditioners and electric motors can draw substantially more current during startup than during normal operation.

This starting requirement must be included when selecting generator capacity.

kW and kVA

Generator capacity may be expressed in kilowatts (kW) or kilovolt-amperes (kVA). The relationship depends on power factor.

For larger commercial and industrial applications, professional load assessment is recommended rather than relying on a simple conversion alone.

Single Phase or Three Phase?

Confirm the electrical system before ordering.

Browse single-phase generators or three-phase generators according to the site requirement.

Standby vs Prime Duty

Standby equipment is generally selected for outage backup, while prime-rated equipment may operate for extended periods where grid supply is limited or absent.

Allow for Future Expansion

If additional equipment is likely to be added, allow reasonable capacity for future loads without grossly oversizing the generator.

Generator Selection Checklist

  • Total running load
  • Largest starting load
  • Voltage
  • Frequency
  • Phase
  • Expected runtime
  • Duty classification
  • Noise requirements
  • Installation environment
  • Future expansion

Continue Your Research

Browse Diesel Generators Africa, the main Generator Solutions page and the diesel generator catalogue.

Manufacturer References

Current manufacturer documentation from Cummins and Perkins can help confirm model-specific ratings and duty classifications.

Need Help Sizing?

Send your equipment list and project details and we can use them to help narrow the generator options.

Request Sizing Support